How to plan buying for an office, shop or hotel fit-out, from the bill of quantities to staged deliveries, so materials arrive when they're needed.

Last updated November 6, 2026

Scaffolding around a building under construction

A fit-out has hundreds of items arriving from different suppliers, in an order that has to match the work on site. Most delays come from something arriving too late, or arriving too early with nowhere to store it. A little planning prevents both.

Start from the bill of quantities

The bill of quantities (BOQ) is the itemised list of everything the job needs. Even a draft BOQ is enough to start pricing, find long-lead items and set a realistic budget.

Find the long-lead items first

Some items take weeks or months: custom joinery, imported lighting, specialist flooring, lifts. Order these first, as soon as the design for them is fixed. Everything else can follow the programme.

Match deliveries to the stages

Group items by when they’re installed, for example:

  1. First fix: cabling, pipes, framing
  2. Ceilings, partitions and flooring
  3. Second fix: lights, sockets, sanitaryware
  4. Furniture, equipment and signage

Then schedule deliveries for each group just before it’s needed.

Plan for substitutes

Something will be out of stock. Decide in advance who can approve a substitute, and what “equivalent” means for the important items, so a shortage doesn’t stop the site.

Check deliveries against the list

Check each delivery against the BOQ as it arrives, and record what’s missing or damaged straight away. It’s much harder to claim for a problem weeks later.